| Sector | abcStainless Steel | Tender Value | 62.76 Lakhs approx. | Location | Jharkhand - India | Ref.No | 85618790 | Closing Date | 28 - Jul - 2025 | | | CHNG CONVNAL ROLLER OF R/TABLE,RHF,HSM Changing of conventional rollers (dismantling & erection) of discharge roller table of RHFs in HSM. * CHNG,MODIFIED ROLLER OF R/TABLE,RHF,HSM Changing of modified rollers (dismantling & erection) with liners fixing in the housing of discharge roller table of RHFs in HSM. * HUB CHNG OF R/TABLE,RHF,HSM Hub changing of discharge roller table of RHFs in HSM. * CHNG DISCHARGE DOORS TO CHANGE DISCHARGE DOORS OF RHF * ERN&DISMAN OF SCAFFOLDING Erection & dismantling of scaffoldings. The job involvesa. Placing of ladders whenever necessary to be done b. Temporary scaffoldings to be made as & when required c. Lifting of structure to required heights d. Making necessary scaffoldings e. Removal of scaffoldings after completion of work f. Removal of scraps * CHNG WLKNG BM SPM- III CHANGING OF WALKING BEAM ASSEMBLY IN SPM- III * CHANG OF WALKING BEAM WHEELS. CHANG OF WALKING BEAM WHEELS. * CHNG OF WALKING BEAM LIFT CYL Walking Beam Lift Cylinder(Main), Traverse Cylinder(Main), Traverse Cylinder (Aux), Aux W/B Lift Cylinder, POR Coil Car Trav & Lift Cylinder, TR Coil Car Lift Cylinder, TR Exp-Collapse Cylinder, POR Exp-Collapse Cylinder/ Entry guide traverse cylinder in CRM * COIL CAR BOTH SIDE WHEEL CHANGE Coil Car Wheel change both side (02 nos.). The job involves - i) Opening of platform pockets ii) Positioning of coil car iii) Lifting of coil car iv) Opening of pedestal bolts / pin v) Removal of wheel through pockets vi) Lowering of new wheel through pockets vii) Positioning of wheel below coil car viii) Fixing in position after lowering coil car * CHNG LINER OF TILTER OF SPM-III CHANGING OF LINERS OF COIL TILTER IN SPM3 OF CRM3. * CHNG COIL TLTR IN SPM-III CHANGING OF COIL TILTER MOVABLE & TILTING CYLINDER OF SPM-III * CHNG,POW TRACK OF ENTRY COIL CAR,1&2SPM3 CHANGING OF POWER TRACK OF ENTRY COIL CAR,1 & 2 IN SPM-III * CHNG OF COIL CAR LIFT&CYL,SPM-III CHANGING OF COIL CAR LIFTING CYLINDER OF SPM-III * COIL CAR TRAVERSE CYL CHNG IN SPM-III COIL CAR TRAVERSE CYLINDER CHANGING IN SPM-III * RPRG OF COIL CAR ASSY OF SPM-III COIL CAR COMPLETE ASSEMBLY REPAIR & CHANGING OF SPM-III * REPAIR AND ASSEMBLY OF GEAR BOX Repair and assembly of gear box as per following activities a) Positioning and cleaning, b) Removal of all fasteners and dismantling, c)Repairing/changing of damaged internals by repositioning,bearing fitting, coupling fitting and pressing d0 Checking for teeth matching and adjusting properly, e) cleaning of gear box joint surface, apply sealing compound and fitting of the gear box * REP/REV COILER MANDREL OF SPM-III REPAIR/REVISIONING OF COILER MANDREL IN SPM3 OF CRM-III * UNCL MANDREL DISM/ REP/REV, IN SPM-III REPAIR/REVISIONING OF UNCOILER MANDREL IN SPM3 OF CRM-III * CHANG COILER MANDREL SEGMENT IN SPM-III Changing of coiler mandrel segments OF SPM-III * REPLCG OF BRIDLE ROLL,SPM-III Replacing of Briddle roll OF SPM-III * SPINDLE CHANGING IN SPM-III Changing of Spindle in SPM-III of CRM-III * CHNG BENDING BLOCKS IN SPM-III CHANGING OF BENDING BLOCKS IN SPM-IIIOF CRM-III * REVISIONING BELT WRAPPER CYL, SPM-III CHANGING OF LIFTING CYLINDER OF BELT WRAPPER OF SPM-III * RPRG OF BELT WRAPPER ASSY,SPM-III DSIMANTLING & ASSEMBLY OF BELT WRAPPER OF SPM-III * ANTI CRIMP ROLL CYL CHNG SPM,CRM3 Job needs to be carried out inside the congested area of mill. Removal of bottom work roll. Lifting of top roll and locking it. Dismantling of all grease/lubrication lines of cylinder. Dismantling of wet skin pass system pipelines. Provision to be made for hanging CPBs to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Dismantling/removal of cylinder. * MAIN DRV. PED. ASSLY. UNIV. SHFT CHNG. Dismantling of brake disc by opening of all coupling bolts with brake disc. Locking of universal shaft from bottom and top. Opening of all pedestal bolts. Dismantling of top pedestal. Removal of bottom work roll from the mill thereby disengaging the universal shaft from work roll. Fabrication of derrick system for taking the load and dismantling of universal shaft. Dismantling of complete universal shaft and its coupling. Lowering it and removal of universal assembly with EOT crane. Opening of bolts between distance piece and universal coupling & dismantling of distance piece. Opening of bolts between universal coupling and shaft & dismantling of shaft. Shifting of new shaft to site. Assembly of new shaft with universal coupling at both ends and bolt tightening. Assembly of distance piece with universal coupling and bolt tightening at both ends. Fitting/Erection of new universal shaft. Engaging of bottom work roll. Assembly of pedestal and bolt tightening. Erection/fitting of brake assembly disc and bolt tightening. Trail run and testing. Scope of supply by the contractor Cutting wheel, grinding wheel, wire brush, welding m |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|