Ref. No. : 85368387   
Bolts And Nuts Tenders, Civil Work Tenders, Dismantaling Work Tenders, Fabrication Work Tenders, Gear Tenders, Motor Tenders, Pipeline Project Tenders, plant machinery Tenders, Steel Plate Tenders, Steel Tube Tenders, Structure Work Tenders, Track Work Tenders, Welding Electrode and Stores Tenders, Wire And Cable Tenders
Bolts And Nuts Tenders, Civil Work Tenders, Dismantaling Work Tenders, Fabrication Work Tenders, Gear Tenders, Motor Tenders, Pipeline Project Tenders, Plant Machinery Tenders, Steel Plate Tenders, Steel Tube Tenders, Structure Work Tenders, Track Work Tenders, Welding Electrode and Stores Tenders, Wire And Cable Tenders
Company Name : Can be viewed by Subscribers
Product Detail : STRL REPAIR,DAMAGED STR Structural repair of damaged structure *
SPRING BUFFER CHANGING SMS-II Spring Buffers changing 1) Locking of Hanging gear box 2) Making necessary scaffoldings 3) Opening of bolts of spring buffer system 4) Dismatling of spring buffer from old hanging gear box 5) Shifing of new spring buffer 6) Erection of new spring buffer 7) Levelling and aligment of spring buffer 8) Bolt tightening of spring buffer 9) Removal of scaffolding and dismantling of lock support *
CGT SPRING BUFFER SMS-II CGT of spring buffer and fixing arrangements 1) Maknig necessary scaffoldings 2) Checking of alignment of spring buffer 3)Foundation bolt tightening with Hammer/CPBs 4) Tightening of check nuts 5) Chanigng of damaged nut/bolts 5) Rmoval of scaffoldings 6) 1 SET consisits of 6*2 =12 spring buffers *
IN-SITU SEAL CHNG HANG & BULL G/B SMS-II In situ seal changing of Hanging gear box and bull gear box 1) making necessary scaffoldins 2) Opening the bolts of end cover of gear box 3) Removal of seal retaining plate/disc 4) Removal of old damaged seal 5) Cleaning the sitting surface of seal 6) Erection of new seal 7) Erection of seal retaining plate/disc 8) Tightening of bolts of end cover 9) Dismantling of scaffoldings *
IN-SITU OVERHAUL MECH HOLD DEVICE SMS-II In situ overhauling of Mechanical holding device 1) Checking for free movement of both lever about fulcrum of mechanical holding device 2) Checking/Changing bush arrangement system of levers 3) Checking of all the pins from lever of lever arrangement 4) Strengthening/repair of lever to be done where ever possible 5) Checking of all 12 foundation studs & revisioning it 6) Checking for steadiness of all foundation studs in which mechanical holding device rests & if any studs found damaged then it needs to be changed 7) Repairing of frame of foundation 8) Strengthening of Mechanical holding device *
PIN CHNG LINK MECH HOLD DEVICE SMS-II Pin changing of vertical link of Mechanical holding device 1) Jacking of Mechanical holding device 2) Locking the vertical link 3) Removal of nut from the Pin and remoival of lock plate of link. 4) Cleat welding the Pin head 5) Dismantling of old pin by pulling the pin with CPBs 6) Buffing the pin sitting area and new pin 7) Erection of new pin 8) Nut tightening and locknig of pin with lock plate 8) Dismantling the locking support of vertical link 9) Releasing the jack *
CHNG UNDER CARRIAGE WHEEL & AXLE ASSLY Changing of Under carriage wheel & axle assembly. 1) Jacking of Carriage with the help of 100T jack. 2) Locking of carriage 3) Dismantling of old wheel and axle assembly ( 2nos.). 4) Shifting of wheel and axle assembly from zero meter to 46m level. 5) Erection of new wheel and axle assembly 6) Cutting of lock support after placing jack under the carriage. *
ALIGNMENT UNDER CARRIAGE WHEEL Alignment of under carriage wheels 1) Checking the levels of wheel (4 Nos.) with the help of water level and SIGS survey 2) Jacking of carriage with 100 T hydraulic jack 3) Aligment of wheel by giving sufficient packing 4) Removing the jack and resting the wheel on Rail track. 5) CHecking the level of wheel. *
ALIGN UNDER CARRIAGE RAIL & LEVEL Alignment of under carriage rails and levelling 1) Checking the levels of rail track (2 Nos.) with the help of water level and SIGS survey 2) Jacking of carriage with 100 T hydraulic jack 3) Loosening the bolts of rail track 4) Aligment of rail track by giving sufficient packing 5) Removing the jack and resting the wheel on Rail track. 5) CHecking the level of rail track accross the length *
ALIGN LANCE GUIDE & BOLT TIGHT Alignment of lance guide and bolts tightening/ checking 1) Making the scaffolding at the joint of lance guide which is at 46m level 2) Checking the verticality of the guide with the help of piano wire 3) Taking the reading at 3 different levels (i.e. Top of lance guide, at the joint and at bottom most point) 4) Taking the load of Lance guide with 10T CPB (2 nos.) 5) Lossening the joint bolts of the lance guide 6) Inserting the required packing for levelling the lance guide 7) Tightening of joints 8) Removal of CPB 9) Checking the verticality of lance guide 10) Removal of scaffolding. *
INSPECTION LANCE GUIDE LINER 46M TO 23M "Inspection of lance guide liners from 46m to 23m 1) Making the scaffolding at various levels of lance guide from 46m level to 23 meter level 2) Checking/Inspection of liners with shop or as per defect list 3) Dismantling of old liners 4) Erection of new liners and bolt tightening 5) Removal of scaffoldings " *
REPLCG OF TOP HEADER,CONVERTER,SMS-II Stack Top Header Replacement. Dismantling & Installation of pre Fabricated top header of dia 4200mm. Dismantling & re erection of collecting main welding of stab joints of header with collecting main. Erection of s scaffolding as per requirement *
CHNG UNDER CARRIAGE SCREW & NUT ASSLY Changing of under carriage screw and
Tender Detail : STRL REPAIR,DAMAGED STR Structural repair of damaged structure *# SPRING BUFFER CHANGING SMS-II Spring Buffers changing 1) Locking of Hanging gear box 2) Making necessary scaffoldings 3) Opening of bolts of spring buffer system 4) Dismatling of spring buffer from old hanging gear box 5) Shifing of new spring buffer 6) Erection of new spring buffer 7) Levelling and aligment of spring buffer 8) Bolt tightening of spring buffer 9) Removal of scaffolding and dismantling of lock support *# CGT SPRING BUFFER SMS-II CGT of spring buffer and fixing arrangements 1) Maknig necessary scaffoldings 2) Checking of alignment of spring buffer 3)Foundation bolt tightening with Hammer/CPBs 4) Tightening of check nuts 5) Chanigng of damaged nut/bolts 5) Rmoval of scaffoldings 6) 1 SET consisits of 6*2 =12 spring buffers *# IN-SITU SEAL CHNG HANG & BULL G/B SMS-II In situ seal changing of Hanging gear box and bull gear box 1) making necessary scaffoldins 2) Opening the bolts of end cover of gear box 3) Removal of seal retaining plate/disc 4) Removal of old damaged seal 5) Cleaning the sitting surface of seal 6) Erection of new seal 7) Erection of seal retaining plate/disc 8) Tightening of bolts of end cover 9) Dismantling of scaffoldings *# IN-SITU OVERHAUL MECH HOLD DEVICE SMS-II In situ overhauling of Mechanical holding device 1) Checking for free movement of both lever about fulcrum of mechanical holding device 2) Checking/Changing bush arrangement system of levers 3) Checking of all the pins from lever of lever arrangement 4) Strengthening/repair of lever to be done where ever possible 5) Checking of all 12 foundation studs & revisioning it 6) Checking for steadiness of all foundation studs in which mechanical holding device rests & if any studs found damaged then it needs to be changed 7) Repairing of frame of foundation 8) Strengthening of Mechanical holding device *# PIN CHNG LINK MECH HOLD DEVICE SMS-II Pin changing of vertical link of Mechanical holding device 1) Jacking of Mechanical holding device 2) Locking the vertical link 3) Removal of nut from the Pin and remoival of lock plate of link. 4) Cleat welding the Pin head 5) Dismantling of old pin by pulling the pin with CPBs 6) Buffing the pin sitting area and new pin 7) Erection of new pin 8) Nut tightening and locknig of pin with lock plate 8) Dismantling the locking support of vertical link 9) Releasing the jack *# CHNG UNDER CARRIAGE WHEEL & AXLE ASSLY Changing of Under carriage wheel & axle assembly. 1) Jacking of Carriage with the help of 100T jack. 2) Locking of carriage 3) Dismantling of old wheel and axle assembly ( 2nos.). 4) Shifting of wheel and axle assembly from zero meter to 46m level. 5) Erection of new wheel and axle assembly 6) Cutting of lock support after placing jack under the carriage. *# ALIGNMENT UNDER CARRIAGE WHEEL Alignment of under carriage wheels 1) Checking the levels of wheel (4 Nos.) with the help of water level and SIGS survey 2) Jacking of carriage with 100 T hydraulic jack 3) Aligment of wheel by giving sufficient packing 4) Removing the jack and resting the wheel on Rail track. 5) CHecking the level of wheel. *# ALIGN UNDER CARRIAGE RAIL & LEVEL Alignment of under carriage rails and levelling 1) Checking the levels of rail track (2 Nos.) with the help of water level and SIGS survey 2) Jacking of carriage with 100 T hydraulic jack 3) Loosening the bolts of rail track 4) Aligment of rail track by giving sufficient packing 5) Removing the jack and resting the wheel on Rail track. 5) CHecking the level of rail track accross the length *# ALIGN LANCE GUIDE & BOLT TIGHT Alignment of lance guide and bolts tightening/ checking 1) Making the scaffolding at the joint of lance guide which is at 46m level 2) Checking the verticality of the guide with the help of piano wire 3) Taking the reading at 3 different levels (i.e. Top of lance guide, at the joint and at bottom most point) 4) Taking the load of Lance guide with 10T CPB (2 nos.) 5) Lossening the joint bolts of the lance guide 6) Inserting the required packing for levelling the lance guide 7) Tightening of joints 8) Removal of CPB 9) Checking the verticality of lance guide 10) Removal of scaffolding. *# INSPECTION LANCE GUIDE LINER 46M TO 23M "Inspection of lance guide liners from 46m to 23m 1) Making the scaffolding at various levels of lance guide from 46m level to 23 meter level 2) Checking/Inspection of liners with shop or as per defect list 3) Dismantling of old liners 4) Erection of new liners and bolt tightening 5) Removal of scaffoldings " *# REPLCG OF TOP HEADER,CONVERTER,SMS-II Stack Top Header Replacement. Dismantling & Installation of pre Fabricated top header of dia 4200mm. Dismantling & re erection of collecting main welding of stab joints of header with collecting main. Erection of s scaffolding as per requirement *# CHNG UNDER CARRIAGE SCREW & NUT ASSLY Changing of under carriage screw and nut assembly and ensuring free movement 1) Jacking of Carriage with the help of 100T jack. 2) Dismantling of pedestal, gear box and motor assembly 3) Removal of screw and nut assembly 4) Erection of new screw and nut assembly 5) Erection of pedestal and bolt tightening 6) Erection of gear box and motor assembly *# CHNG/RPR LANCE GUIDE CHANG STAND, STRUC Changing/ repair of lance guide changing stand and supporting structure 1) Dismantling the damaged structure of lance guide changing stand 2) Dismantling of damaged supporting structures 3) Erection and alignment of new structures of lance guide stand and its supporting structures. *# STRENGTHENING -COLUM/PLATFORM/BEAM Strengthening of steel work in columns, platform main/ cross beam including built-up beam, platform etc. of existing stockade supporting overhead pipe lines by (A) Welding suitable size plate of 12 mm / next available thickness to web, flange, etc. of the existing section or in the built-up beam. (B) Replacing cross bracing/ horizontal bracing/ vertical bracing, built-up section, platform cross angle, double angle bracket etc. by suitable size angle / structural or built-up section. (C) Replacing the existing chequered plate by new one in the platform etc. as per the direction of engineer in-charge including cutting ,hoisting, fixing in position <(>&<)> applying a primary coat of red oxide zinc chromate primer all complete . Quality two round welding is to be ensured. Scaffolding and other support work required for the necessary replacement above will also have to carry out. *# INSTALL TUBE,TOP HEADER REPLCG,SMS-II *# WLDG OF TUBE JT,TOP HEADER REPLCG,SMS-II Welding of tube joints of Dia 60.3x4.5mm to facilitate erection of pre-fabricated top header fixing of sealing MS strips between tubes & welding on both sides erection of scaffolding as per requirement *# REPLCG OF STACK SEAL ASSLY,CONV ,SMS-II Stack Seal Assembly Replacement Dismantling & Erection of stack seal assembly erection of scaffolding as per requirement.
Tender Location : Jharkhand - India
Document Path : Can be viewed by Subscribers
Tender Value : 4398719
Tender Closing Date : 21/07/2025 at 00:00 Hrs.
Tender Opening Date : 22/07/2025 at 00:00 Hrs.
Address : Can be viewed by Subscribers
Sub-Industry/Industry : Stainless Steel - Iron and Steel   
 Login/Register
Members/Visitors Login to continue
 Email Id:
 Password:


 Forgot Password?
 Tenders by Industry
Skip Navigation Links.
Expand Aviation Equipment TendersAviation Equipment Tenders
Expand Chemicals TendersChemicals Tenders
Expand Communications Services     TendersCommunications Services Tenders
Expand Construction TendersConstruction Tenders
Expand Electrical TendersElectrical Tenders
Expand Electronics TendersElectronics Tenders
Expand Fabrication TendersFabrication Tenders
Expand Financial Services TendersFinancial Services Tenders
Expand Food Products               TendersFood Products Tenders
Expand Iron and Steel TendersIron and Steel Tenders
Expand Lab Equipments TendersLab Equipments Tenders
Expand Leather Products            TendersLeather Products Tenders
Expand Magnetic Equipments TendersMagnetic Equipments Tenders
Expand Material Handling TendersMaterial Handling Tenders
Expand Mining and Quarrying          TendersMining and Quarrying Tenders
Expand Misclaneous                 TendersMisclaneous Tenders
Expand Non Classified TendersNon Classified Tenders
Expand Non-electrical Machinery    TendersNon-electrical Machinery Tenders
Expand Non-Ferrous Metals          TendersNon-Ferrous Metals Tenders
Expand Non-financial Services TendersNon-financial Services Tenders
Expand Non-metallic Mineral Product TendersNon-metallic Mineral Product Tenders
Expand Plastic TendersPlastic Tenders
Expand Power Plant TendersPower Plant Tenders
Expand Rubber Products TendersRubber Products Tenders
Expand Textiles TendersTextiles Tenders
Expand Transport Equipments        TendersTransport Equipments Tenders
Expand Transport Services          TendersTransport Services Tenders
Expand Wood Paper and Paper Products TendersWood Paper and Paper Products Tenders
more  »
Tenders by Ownership
Central Government/Public Sector Tenders
Co-operatives Tenders
Corporations/ Associations/ Others Tenders
Education & Research Institutes Tenders
Joint Sector Tenders
Non classified Tenders
Private Sector Tenders
Research Institutes Tenders
State Government Tenders
Trust Tenders
 Tenders by State in India
Skip Navigation Links.