|
Automobile Ancillaries Tenders, Bolts And Nuts Tenders, Clutch Tenders, Compressor Tenders, Coupling Device Tenders, Crane Tenders, Dismantaling Work Tenders, Diversified Electrical Spares And Stores Tenders, Drill Machine Tenders, Drilling Work Tenders, Fabrication Work Tenders, Fasteners Tenders, Gear Tenders, Grinder Tenders, Grinding Machine Tenders, hoist Tenders, Jack Tenders, M S Pipe Tenders, Metal Products Tenders, Metal Sheet Tenders, Paint Tenders, Pin Tenders, Pinion Set Tenders, Pipeline Project Tenders, plant machinery Tenders, pump Tenders, Rail Accessories Tenders, Scrap Tenders, screw Tenders, Steel Plate Tenders, Testing Equipment Tenders, Tool Tenders, Welding Electrode and Stores Tenders, Wire And Cable Tenders |
|
Automobile Ancillaries Tenders, Bolts And Nuts Tenders, Clutch Tenders, Compressor Tenders, Coupling Device Tenders, Crane Tenders, Dismantaling Work Tenders, Diversified Electrical Spares And Stores Tenders, Drill Machine Tenders, Drilling Work Tenders, Fabrication Work Tenders, Fasteners Tenders, Gear Tenders, Grinder Tenders, Grinding Machine Tenders, Hoist Tenders, Jack Tenders, M S Pipe Tenders, M S Scrap Tenders, Metal Products Tenders, Metal Sheet Tenders, Paint Tenders, Pin Tenders, Pinion Set Tenders, Pipeline Project Tenders, Plant Machinery Tenders, Pump Tenders, Rail Accessories Tenders, Screw Tenders, Steel Plate Tenders, Testing Equipment Tenders, Tool Tenders, Welding Electrode and Stores Tenders, Wire And Cable Tenders |
|
Company Name :
|
Can be viewed by Subscribers
|
Product Detail :
|
CHNG CONVNAL ROLLER OF R/TABLE,RHF,HSM Changing of conventional rollers (dismantling & erection) of discharge roller table of RHFs in HSM. * CHNG,MODIFIED ROLLER OF R/TABLE,RHF,HSM Changing of modified rollers (dismantling & erection) with liners fixing in the housing of discharge roller table of RHFs in HSM. * HUB CHNG OF R/TABLE,RHF,HSM Hub changing of discharge roller table of RHFs in HSM. * CHNG DISCHARGE DOORS TO CHANGE DISCHARGE DOORS OF RHF * ERN&DISMAN OF SCAFFOLDING Erection & dismantling of scaffoldings. The job involvesa. Placing of ladders whenever necessary to be done b. Temporary scaffoldings to be made as & when required c. Lifting of structure to required heights d. Making necessary scaffoldings e. Removal of scaffoldings after completion of work f. Removal of scraps * CHNG WLKNG BM SPM- III CHANGING OF WALKING BEAM ASSEMBLY IN SPM- III * CHANG OF WALKING BEAM WHEELS. CHANG OF WALKING BEAM WHEELS. * CHNG OF WALKING BEAM LIFT CYL Walking Beam Lift Cylinder(Main), Traverse Cylinder(Main), Traverse Cylinder (Aux), Aux W/B Lift Cylinder, POR Coil Car Trav & Lift Cylinder, TR Coil Car Lift Cylinder, TR Exp-Collapse Cylinder, POR Exp-Collapse Cylinder/ Entry guide traverse cylinder in CRM * COIL CAR BOTH SIDE WHEEL CHANGE Coil Car Wheel change both side (02 nos.). The job involves - i) Opening of platform pockets ii) Positioning of coil car iii) Lifting of coil car iv) Opening of pedestal bolts / pin v) Removal of wheel through pockets vi) Lowering of new wheel through pockets vii) Positioning of wheel below coil car viii) Fixing in position after lowering coil car * CHNG LINER OF TILTER OF SPM-III CHANGING OF LINERS OF COIL TILTER IN SPM3 OF CRM3. * CHNG COIL TLTR IN SPM-III CHANGING OF COIL TILTER MOVABLE & TILTING CYLINDER OF SPM-III * CHNG,POW TRACK OF ENTRY COIL CAR,1&2SPM3 CHANGING OF POWER TRACK OF ENTRY COIL CAR,1 & 2 IN SPM-III * CHNG OF COIL CAR LIFT&CYL,SPM-III CHANGING OF COIL CAR LIFTING CYLINDER OF SPM-III * COIL CAR TRAVERSE CYL CHNG IN SPM-III COIL CAR TRAVERSE CYLINDER CHANGING IN SPM-III * RPRG OF COIL CAR ASSY OF SPM-III COIL CAR COMPLETE ASSEMBLY REPAIR & CHANGING OF SPM-III * REPAIR AND ASSEMBLY OF GEAR BOX Repair and assembly of gear box as per following activities a) Positioning and cleaning, b) Removal of all fasteners and dismantling, c)Repairing/changing of damaged internals by repositioning,bearing fitting, coupling fitting and pressing d0 Checking for teeth matching and adjusting properly, e) cleaning of gear box joint surface, apply sealing compound and fitting of the gear box * REP/REV COILER MANDREL OF SPM-III REPAIR/REVISIONING OF COILER MANDREL IN SPM3 OF CRM-III * UNCL MANDREL DISM/ REP/REV, IN SPM-III REPAIR/REVISIONING OF UNCOILER MANDREL IN SPM3 OF CRM-III * CHANG COILER MANDREL SEGMENT IN SPM-III Changing of coiler mandrel segments OF SPM-III * REPLCG OF BRIDLE ROLL,SPM-III Replacing of Briddle roll OF SPM-III * SPINDLE CHANGING IN SPM-III Changing of Spindle in SPM-III of CRM-III * CHNG BENDING BLOCKS IN SPM-III CHANGING OF BENDING BLOCKS IN SPM-IIIOF CRM-III * REVISIONING BELT WRAPPER CYL, SPM-III CHANGING OF LIFTING CYLINDER OF BELT WRAPPER OF SPM-III * RPRG OF BELT WRAPPER ASSY,SPM-III DSIMANTLING & ASSEMBLY OF BELT WRAPPER OF SPM-III * ANTI CRIMP ROLL CYL CHNG SPM,CRM3 Job needs to be carried out inside the congested area of mill. Removal of bottom work roll. Lifting of top roll and locking it. Dismantling of all grease/lubrication lines of cylinder. Dismantling of wet skin pass system pipelines. Provision to be made for hanging CPBs to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Dismantling/removal of cylinder. * MAIN DRV. PED. ASSLY. UNIV. SHFT CHNG. Dismantling of brake disc by opening of all coupling bolts with brake disc. Locking of universal shaft from bottom and top. Opening of all pedestal bolts. Dismantling of top pedestal. Removal of bottom work roll from the mill thereby disengaging the universal shaft from work roll. Fabrication of derrick system for taking the load and dismantling of universal shaft. Dismantling of complete universal shaft and its coupling. Lowering it and removal of universal assembly with EOT crane. Opening of bolts between distance piece and universal coupling & dismantling of distance piece. Opening of bolts between universal coupling and shaft & dismantling of shaft. Shifting of new shaft to site. Assembly of new shaft with universal coupling at both ends and bolt tightening. Assembly of distance piece with universal coupling and bolt tightening at both ends. Fitting/Erection of new universal shaft. Engaging of bottom work roll. Assembly of pedestal and bolt tightening. Erection/fitting of brake assembly disc and bolt t
|
Tender Detail : |
CHNG CONVNAL ROLLER OF R/TABLE,RHF,HSM Changing of conventional rollers (dismantling & erection) of discharge roller table of RHFs in HSM. *# CHNG,MODIFIED ROLLER OF R/TABLE,RHF,HSM Changing of modified rollers (dismantling & erection) with liners fixing in the housing of discharge roller table of RHFs in HSM. *# HUB CHNG OF R/TABLE,RHF,HSM Hub changing of discharge roller table of RHFs in HSM. *# CHNG DISCHARGE DOORS TO CHANGE DISCHARGE DOORS OF RHF *# ERN&DISMAN OF SCAFFOLDING Erection & dismantling of scaffoldings. The job involves:a. Placing of ladders whenever necessary to be done b. Temporary scaffoldings to be made as & when required c. Lifting of structure to required heights d. Making necessary scaffoldings e. Removal of scaffoldings after completion of work f. Removal of scraps *# CHNG WLKNG BM SPM- III CHANGING OF WALKING BEAM ASSEMBLY IN SPM- III *# CHANG OF WALKING BEAM WHEELS. CHANG OF WALKING BEAM WHEELS. *# CHNG OF WALKING BEAM LIFT CYL Walking Beam Lift Cylinder(Main), Traverse Cylinder(Main), Traverse Cylinder (Aux), Aux W/B Lift Cylinder, POR Coil Car Trav & Lift Cylinder, TR Coil Car Lift Cylinder, TR Exp-Collapse Cylinder, POR Exp-Collapse Cylinder/ Entry guide traverse cylinder in CRM *# COIL CAR BOTH SIDE WHEEL CHANGE Coil Car Wheel change both side (02 nos.). The job involves: - i) Opening of platform pockets ii) Positioning of coil car iii) Lifting of coil car iv) Opening of pedestal bolts / pin v) Removal of wheel through pockets vi) Lowering of new wheel through pockets vii) Positioning of wheel below coil car viii) Fixing in position after lowering coil car *# CHNG LINER OF TILTER OF SPM-III CHANGING OF LINERS OF COIL TILTER IN SPM3 OF CRM3. *# CHNG COIL TLTR IN SPM-III CHANGING OF COIL TILTER MOVABLE & TILTING CYLINDER OF SPM-III *# CHNG,POW TRACK OF ENTRY COIL CAR,1&2SPM3 CHANGING OF POWER TRACK OF ENTRY COIL CAR,1 & 2 IN SPM-III *# CHNG OF COIL CAR LIFT&CYL,SPM-III CHANGING OF COIL CAR LIFTING CYLINDER OF SPM-III *# COIL CAR TRAVERSE CYL CHNG IN SPM-III COIL CAR TRAVERSE CYLINDER CHANGING IN SPM-III *# RPRG OF COIL CAR ASSY OF SPM-III COIL CAR COMPLETE ASSEMBLY REPAIR & CHANGING OF SPM-III *# REPAIR AND ASSEMBLY OF GEAR BOX Repair and assembly of gear box as per following activities: a) Positioning and cleaning, b) Removal of all fasteners and dismantling, c)Repairing/changing of damaged internals by repositioning,bearing fitting, coupling fitting and pressing d0 Checking for teeth matching and adjusting properly, e) cleaning of gear box joint surface, apply sealing compound and fitting of the gear box *# REP/REV COILER MANDREL OF SPM-III REPAIR/REVISIONING OF COILER MANDREL IN SPM3 OF CRM-III *# UNCL MANDREL: DISM/ REP/REV, IN SPM-III REPAIR/REVISIONING OF UNCOILER MANDREL IN SPM3 OF CRM-III *# CHANG COILER MANDREL SEGMENT IN SPM-III Changing of coiler mandrel segments OF SPM-III *# REPLCG OF BRIDLE ROLL,SPM-III Replacing of Briddle roll OF SPM-III *# SPINDLE CHANGING IN SPM-III Changing of Spindle in SPM-III of CRM-III *# CHNG BENDING BLOCKS IN SPM-III CHANGING OF BENDING BLOCKS IN SPM-IIIOF CRM-III *# REVISIONING BELT WRAPPER CYL, SPM-III CHANGING OF LIFTING CYLINDER OF BELT WRAPPER OF SPM-III *# RPRG OF BELT WRAPPER ASSY,SPM-III DSIMANTLING & ASSEMBLY OF BELT WRAPPER OF SPM-III *# ANTI CRIMP ROLL CYL CHNG SPM,CRM3 Job needs to be carried out inside the congested area of mill. Removal of bottom work roll. Lifting of top roll and locking it. Dismantling of all grease/lubrication lines of cylinder. Dismantling of wet skin pass system pipelines. Provision to be made for hanging CPBs to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Dismantling/removal of cylinder. *# MAIN DRV. PED. ASSLY. UNIV. SHFT CHNG. Dismantling of brake disc by opening of all coupling bolts with brake disc. Locking of universal shaft from bottom and top. Opening of all pedestal bolts. Dismantling of top pedestal. Removal of bottom work roll from the mill thereby disengaging the universal shaft from work roll. Fabrication of derrick system for taking the load and dismantling of universal shaft. Dismantling of complete universal shaft and its coupling. Lowering it and removal of universal assembly with EOT crane. Opening of bolts between distance piece and universal coupling & dismantling of distance piece. Opening of bolts between universal coupling and shaft & dismantling of shaft. Shifting of new shaft to site. Assembly of new shaft with universal coupling at both ends and bolt tightening. Assembly of distance piece with universal coupling and bolt tightening at both ends. Fitting/Erection of new universal shaft. Engaging of bottom work roll. Assembly of pedestal and bolt tightening. Erection/fitting of brake assembly disc and bolt tightening. Trail run and testing. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# COILER MANDREL SHFT COUP CHNG SPM,CRM3 "Removal of all lubrication lines and grease lines of belt wrapper assembly disc. Opening of all partition bolts (Parting plane with gear box). Complete removal of belt wrapper assembly along with its disc. Opening of all bolts of gear box. Opening of bolts and dismantling of pedestals. Removal/Dismantling of Gear box cover. Locking of distance piece from bottom. Opening of coupling bolts. Removal of shaft coupling. Cleaning of sitting surface of shaft. Shifting of shaft coupling to machine shop. Shifting of new shaft coupling at working site. Erection of shaft. Coupling of distance piece with shaft. Boxing up of gear box and bolt tightening. Erection of belt wrapper assembly disc. Bolt fixing and tightening. Erection of all lubrication lines and grease lines of belt wrapper assembly disc. Trail run and testing. " Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# UNCOILER MANDREL SHFT COUP CHNG SPM,CRM3 At rear end, removal of all lubrication lines and grease lines of rotary joint. Opening of all Allen bolts. Opening of rotary joint bolts. Provision of jack arrangement. Removal of spring pin between rotary joint and shaft. Opening of check nut (Check nut for movement of shaft) at free end of mandrel. Provision of jacking arrangement for pushing the shaft inside the mandrel from rear end to free end. Provision of CPBs at free end for pulling out the shaft from mandrel. Pushing the shaft from rear end and pulling of shaft from free end. Taking the load from EOT crane and removal of shaft from mandrel. Dismantling of shaft. Shifting of new shaft at site. Pushing the shaft from free end and pulling the shaft from rear end. Tightening of check nut at free end. Assembly of rotary joint with the shaft and fixing of spring pin. Bolt tightening and Erection of all lubrication lines and grease lines of belt wrapper assembly disc. Trail run and testing. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# LIFT CYLINDER CHNG. WALK BEAM HRCC,CRM3 "LIFT CYLINDER CHNG. WALK BEAM HRCC,CRM3 This job is to be carried out at -3 m level. Positioning of lifting cylinder. Locking of walking beam body with pin. Provision to be made for hanging CPBs to take load of cylinder. Removal of all lubrication lines and grease lines. Provision of jack arrangement. Removal of lock plate and pin of piston arm with the help of Jack pump. Removal of lock plate and pin of cylinder head. Dismantling/removal of cylinder. Dismantling of clevis from old cylinder. Fixing of clevis in new cylinder. Positioning of new lifting cylinder. Insertion of lock pin of cylinder head and piston arm. Connection of all lubrication/grease lines. Removal of lock pin from walking beam body. Trail and testing of cylinder." *# TRANSVERSE CYL CHNG. WALK BEAM HRCC,CRM3 "TRANSVERSE CYL. CHNG. WALK BEAM HRCC,CRM3 *# COIL OPENER CYL. CHNG. SPM,CRM3 Job needs to be carried out below the coil support table after mandrel in uncoiler side. Necessary scaffoldings/structures to be made for approaching cylinder. Fabrication of derrick system. Taking the load of the support table with CPBs. Dismantling of all grease/lubrication lines of cylinder. Provision to be made for hanging CPBs to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Dismantling/removal of cylinder with EOT crane. Dismantling of clevis from old cylinder. Fixing of clevis in new cylinder. Positioning of new cylinder. Insertion of both lock pins and locking it with lock plate. Connection of all lubrication/grease lines. Releasing the load of the cylinder. Removal of derrick system. Dismantling of scaffoldings/structures. Testing of cylinder. Removal of scrap if any. Trail and testing. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# PASSLINE WORM G/B CHNG. SPM,CRM3 This job is to be carried out in minus level. Removal of grills with EOT crane. Necessary scaffoldings/structures to be made for approaching cylinder. Dismantling of motor coupling. Removal of lead screw pin. Opening of foundation bolts. Dismantling of screw gear box assembly. Provision to be made for hanging CPBs (Derrick system) to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Dismantling/removal of cylinder by tilting it as size of cylinder is long in length. Dismantling of clevis from old cylinder. Fixing of clevis in new cylinder. Positioning of new cylinder. Insertion of both lock pins and locking it with lock plate. Erection of screw gear box assembly. Bolting of foundation. Fixing of lead screw pin. Dismantling of scaffoldings/structures. Erection of grils. Trail and testing. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# SHEAR M/C CYL. CHNG. SPM,CRM3 Removal of supporting structures (vertical posts, bracings, inclined plate etc.) shear machine side. Dismantling of all grease/lubrication lines of cylinder. Provision to be made for hanging CPBs to take load of cylinder. Provision of jack arrangement. Removal of lock plate and both the pins (Top & Bottom) of piston arm with the help of Jack pump. Cylinder head is attached with bracket at top and bracket is welded and bolted with body of shear machine. Removal of brackets by cutting and bolt opening. Dismantling/removal of cylinder. Dismantling of clevis from old cylinder. Fixing of clevis in new cylinder. Fitting of cylinder with bracket. Fitting of bracket with body. Positioning of new cylinder. Insertion of both lock pins and locking it with lock plate. Connection of all lubrication/grease lines. Erection of all supporting structures and strengthening it. Testing of cylinder. Removal of scrap if any. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# BRIDDLE ROLL CHNG. SPM,CRM3 Dismantling of top guide of snubber roll. Cutting & dismantling of top table. Removal of snubber roll assembly with its pedestal. Dismantling of top circular guide. Dismantling of end cover of top briddle roll. With EOT crane removal of top briddle roll with its pedestal. Removal of springs at both the ends between top and bottom briddle roll. Removal of bottom briddle roll. Dismantling of pedestals from old briddle rolls. Assembly of pedestals in new briddle rolls. Shifting and erection of bottom briddle roll. Erection of springs over bottom briddle roll. Shifting and erection of top briddle roll. Erection of top circular guide. Erection of snubber roll assembly. Erection of top table and guide. Trail and testing. Scope of supply by the contractor: Cutting wheel, grinding wheel, wire brush, welding machine, all tools and tackles required for execution of the job. *# STRENGTHENING -COLUM/PLATFORM/BEAM Strengthening of steel work in columns, platform main/ cross beam including built-up beam, platform etc. of existing stockade supporting overhead pipe lines by (A) Welding suitable size plate of 12 mm / next available thickness to web, flange, etc. of the existing section or in the built-up beam. (B) Replacing cross bracing/ horizontal bracing/ vertical bracing, built-up section, platform cross angle, double angle bracket etc. by suitable size angle / structural or built-up section. (C) Replacing the existing chequered plate by new one in the platform etc. as per the direction of engineer in-charge including cutting ,hoisting, fixing in position <(>&<)> applying a primary coat of red oxide zinc *# SCAFFOLDING/STRUC FAB,EREC,DISMANTLING Temporary scaffolding /structural fabrication, erection & dismantaling as & where required. *# SHIFTING/LOADING/UNLOADING SHIFTING/LOADING/UNLOADING SPARES/CONSUMABLES/OTHER ITEMS FROM BSL STORES/ENGG SHOPS/OTHER PLACES. *# WELDING WORK WELDING WORK |
|
Tender Location : |
Jharkhand - India |
Document Path : |
Can be viewed by Subscribers
|
Tender Value : |
6276201
|
Tender Closing Date : |
28/07/2025 at 00:00 Hrs. |
Tender Opening Date : |
29/07/2025 at 00:00 Hrs. |
Address : |
Can be viewed by Subscribers
|
Sub-Industry/Industry : |
Stainless Steel - Iron and Steel
|
|
|
|
|
|