|
Company Name :
|
Can be viewed by Subscribers
|
|
Product Detail :
|
CHNG PCKG OF UNION FLANGE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Changing packing/gasket of union, flange of hyd. * CHNG PIPE & HOSE OF ENTRY & EXIT GUIDE Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Disconnection/connection of spinde balancing, pinch roll descaler entry guide, exit guide pipe & hoses. * MAINT HIGH PR HOSES WITH O-RING,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Changing high pressure Hoses along with O ring testing & normalisation * INSTLN NEW CLAMP/25-80MM&WELD OLD/HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To installnew clamps & to weld broken pipe clamps (25-80mm) * REPLCG OF FILTER ELEMENT,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To replace filter element (Pr. & Return, Re-circulation filter). * REPLCG OF DC,RELIEF&SHUT OFF VLV,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Replace DC valve, relief valve & shut off valve * MAINT HEAT EXCHANGER Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Dismantling, cleaning, assembly of heat exchanger testing & normalise * TESTG M BLOCK HYD PIPELINE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Disconnection/connection of M.Block hyd.pipe line testing and normalisation. * INSTLN OF NEW CLAMP/HGC PIPE LINE Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To install new clamps on WRB/HGC pipe lines on mill satnds (size 40-100mm) including welding of support channel * LAYG OF GREASE PIPE 10X1.5MM,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To change and lay out new grease pipes on guides, loopers, ROT rolls for feeding grease including connection with feeders testing and normalization (ferrule, fitting & pipe bending to be done as per reqd.during work size10 x1.5mm) * MAINT GREASE PIPE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To disconnect/connect grease pipes & hoses for eqpt. Work in Finishing Mill & ROT areas * CHNG OF GREASE LINE HOSES PCKG,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To change feeders grease line hoses packing of grease testing & normalization. * CHANGING OF SWIVEL JOINT OF COILER Isolating,removal, fixing, normalisation and testing of swivel joint of coiler, HSM. * TIGHTENING OF PIPE CLAMP OF FIN & COILER Tightening of pipe clamps (25-100mm) installed in hyd tank /cellarof finishing & coiler HSM * CHANGING OF HP HOSE IN MILL PIT & TUNNEL Changing of high pressure hoses of finishing & coiler pit HSM * TIGHTENING OF PIPE FLANGE & UNION OF FIN Tightening of pipe line flange and union of finishing & coiler pit & tunnel HSM * TIGHTENING OF FIXING BOLTS OF VALVE STAN To tighten fixing bolts of servo boxes and valve stands of finishing & coiler HSM * ERRECTION & ALIGNMENT OF MAIN PUMP Errection and alignment of main pump in hyd room finishing & coiler HSM * SERVICING OF HEAT EXCHANGER OF FIN Servicing/cleaning and comissioning of heat exchanger finishing & coiler HSM * TIGHTENING OF PUMP & ACC JOINT BOLT Tightening of pump base bolts accuulator mounting bolts of finishing & coiler HSM * TIGHTENING OF FLANGE & UNION OF COILER L To tighten pipe flanges and unions of lub lines of coiler HSM * GREASE DISCONNECTION/CONN OF CCOT ROLL To disconnect / connect grease connection of CCOT rolls of coiler HSM * HYD DISCONNECTION/CONN OF COILER EQUIP To disconnect / connect hyd cylinders connection of pinch roll liftings ,L&T Table , Wrapper roll, entry chute cyl etc. of coiler HSM * GREASE DISCONN/CONN OF CONVEYOR ROLL TO disconnect / dconnect grease connection of top and bottom support rolls of HRCF side of coiler HSM * TIGHTENING OF LUB CLAMP IN MILL PIT To tighten clamps of lubrication hoses of finishing & coiler HSM * CHANGING OF FEEDER IN MILL PIT * CLEANING OF PRESS/RETURN LINE FILTER COI To clean pressure lines and return lines filters of DC 1-4. of coiler HSM * GREASE OF SCREW PUMP BB COUP IN COILER Greasing of BB coupling of screw pumps of coiler HSM * PREP OF PIPE BY ARGON ARC WELDING Preparation, argon arc welding errection, testing and normalisaiton of pipe line finishing & coiler HSM * CHANGING OF PUMP COMPENSATOR Chenging of pump compensator of finishing & coiler HSM * REVAMPING OF LIFT/HDGL-NO52N69251 Changing of packing / gasket of union/ flanges of hyd of finishing & coiler HSM erection, testing of new parts, commissioning, <(>&<)> handing over the Lift (Ele
|
| Tender Detail : |
CHNG PCKG OF UNION FLANGE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Changing packing/gasket of union, flange of hyd. *# CHNG PIPE & HOSE OF ENTRY & EXIT GUIDE Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Disconnection/connection of spinde balancing, pinch roll descaler entry guide, exit guide pipe & hoses. *# MAINT HIGH PR HOSES WITH O-RING,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Changing high pressure Hoses along with O ring testing & normalisation *# INSTLN NEW CLAMP/25-80MM&WELD OLD/HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To installnew clamps & to weld broken pipe clamps (25-80mm) *# REPLCG OF FILTER ELEMENT,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To replace filter element (Pr. & Return, Re-circulation filter). *# REPLCG OF DC,RELIEF&SHUT OFF VLV,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Replace DC valve, relief valve & shut off valve *# MAINT HEAT EXCHANGER Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Dismantling, cleaning, assembly of heat exchanger testing & normalise *# TESTG M BLOCK HYD PIPELINE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Disconnection/connection of M.Block hyd.pipe line testing and normalisation. *# INSTLN OF NEW CLAMP/HGC PIPE LINE Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To install new clamps on WRB/HGC pipe lines on mill satnds (size 40-100mm) including welding of support channel *# LAYG OF GREASE PIPE 10X1.5MM,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To change and lay out new grease pipes on guides, loopers, ROT rolls for feeding grease including connection with feeders testing and normalization (ferrule, fitting & pipe bending to be done as per reqd.during work size10 x1.5mm) *# MAINT GREASE PIPE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To disconnect/connect grease pipes & hoses for eqpt. Work in Finishing Mill & ROT areas *# CHNG OF GREASE LINE HOSES PCKG,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/To change feeders grease line hoses packing of grease testing & normalization. *# CHANGING OF SWIVEL JOINT OF COILER Isolating,removal, fixing, normalisation and testing of swivel joint of coiler, HSM. *# TIGHTENING OF PIPE CLAMP OF FIN & COILER Tightening of pipe clamps (25-100mm) installed in hyd tank /cellarof finishing & coiler HSM *# CHANGING OF HP HOSE IN MILL PIT & TUNNEL Changing of high pressure hoses of finishing & coiler pit HSM *# TIGHTENING OF PIPE FLANGE & UNION OF FIN Tightening of pipe line flange and union of finishing & coiler pit & tunnel HSM *# TIGHTENING OF FIXING BOLTS OF VALVE STAN To tighten fixing bolts of servo boxes and valve stands of finishing & coiler HSM *# ERRECTION & ALIGNMENT OF MAIN PUMP Errection and alignment of main pump in hyd room finishing & coiler HSM *# SERVICING OF HEAT EXCHANGER OF FIN Servicing/cleaning and comissioning of heat exchanger finishing & coiler HSM *# TIGHTENING OF PUMP & ACC JOINT BOLT Tightening of pump base bolts accuulator mounting bolts of finishing & coiler HSM *# TIGHTENING OF FLANGE & UNION OF COILER L To tighten pipe flanges and unions of lub lines of coiler HSM *# GREASE DISCONNECTION/CONN OF CCOT ROLL To disconnect / connect grease connection of CCOT rolls of coiler HSM *# HYD DISCONNECTION/CONN OF COILER EQUIP To disconnect / connect hyd cylinders connection of pinch roll liftings ,L&T Table , Wrapper roll, entry chute cyl etc. of coiler HSM *# GREASE DISCONN/CONN OF CONVEYOR ROLL TO disconnect / dconnect grease connection of top and bottom support rolls of HRCF side of coiler HSM *# TIGHTENING OF LUB CLAMP IN MILL PIT To tighten clamps of lubrication hoses of finishing & coiler HSM *# CHANGING OF FEEDER IN MILL PIT *# CLEANING OF PRESS/RETURN LINE FILTER COI To clean pressure lines and return lines filters of DC 1-4. of coiler HSM *# GREASE OF SCREW PUMP BB COUP IN COILER Greasing of BB coupling of screw pumps of coiler HSM *# PREP OF PIPE BY ARGON ARC WELDING Preparation, argon arc welding errection, testing and normalisaiton of pipe line finishing & coiler HSM *# CHANGING OF PUMP COMPENSATOR Chenging of pump compensator of finishing & coiler HSM *# REVAMPING OF LIFT/HDGL-NO:52N69251 Changing of packing / gasket of union/ flanges of hyd of finishing & coiler HSM erection, testing of new parts, commissioning, <(>&<)> handing over the Lift (Elevator). *# HYD DISCONN/CONN OF FINISHING EQUIP Disconnection/connection of spindle balancing , pinch roll descaler, entry /exit guide pipes and hoses of finishing HSM *# CHANGING OF HP HOSE IN MILL PIT TUNNEL Changing of high pressure hoses along with "O"ring , testing and normalisation of finishing & coiler HSM *# MANNUAL GREASING OF BB COUPLIN OF QWRC Mannual greaseing of BB coupling of bend axis pump of QWRC/F125 & 150 of finishing HSM *# REPLACEMENT OF FILTER ELEMENT To replace filter element (Pr. And return , re-circulation ) of finishing & coiler HSM *# REPLACEMENT OF HYD VALVE Replace DC valve , check valves and shute off valve of finishing & coiler HSM *# TIGHTENING OF PUMP & VALVE STAND BOLT Tightening of pump base bolts flange bolts and base bolt of valve stands of finishing & coiler HSM *# REPLACEMENT OF R/C & PILOT FILTER To replace filter pr. Line ,rt line and recirculation of finishing & coiler HSM *# TIGHTENING OF OVERHEAD PIPE CLAMP Tightening of over head pipe clamps mountain in Mill stands of finishing HSM *# TIGHTENING OF PIPE CLAMP IN PIT & TUNNEL Tightening of pipe supports at various place and rectification of finishing & coiler HSM *# DISCONN/CONN OF M BLOCK HYD/GREASE Disconnection / connection of M.Block hyd pipe line testing & normalisation of finishing HSM *# TO INSTALL /REPAIR CLAMP ON STAND TOP To install new clamps onWRB/ HGC pipelines on M/Stands (40-100mm)including welding of support channels of finishing HSM *# ISOLATION OF PIPELINE BY BLANK Isolating pipe lines from system by providing blanks of finishing & coiler HSM *# NORMALISATION OF PIPE LINE Remove pipe isolation connect pipe lines and rectify the problem of observed of finishing & coiler HSM *# PROVISION OF ANCHOR CHANNEL IN PIPE Provide anchor channel at long the length and provide support one mtr. Interval. At one mtr interval of finishing & coiler HSM *# PREPARATION OF PIPE JOINT Position pipes preparation edges by grinding and joints pipes by welding by argon arc welding of finishing & coiler HSM *# MANNUAL REMOVAL OF PIPE FROM PIT Remove pipe isolation connect pipe lines after opening supports flanges and cuttinfg pipes by hackshaw of finishing & coiler HSM *# CLEANING OF MUCK/DEBRIS FROM PIPELINE Removal the muck and bebris around pipes and clear across to the pipe of finishing & coiler HSM . *# PREPARATION OF PIPE BEND Prepare bend pipe assly . By welding and connection and joints after proper edge of finishing & coiler HSM *# DISMENTLING OF HEAT EXCHANGER Dismentaling , cleaning assly , of heat exchanger testing and normalise of finishing & coiler HSM *# CLNG OF WATER STRAINER IN OC,HSM Maintenance of oil lubrication system of OC No: 1, 2, & 3 including Fce, R/G, F/G and also tightening of nipple, union, indicator of M/red.P/std, S/D reducers (R-1 to F-12) of HSM./Cleaning of water strainer in oil cellars. *# CHANG OF 20 MM DIA PIPE IN MILL PIT Isolating , disconnect ,connect Laminar hydraulic /grease hose of dia 20x 3.0 mm of finishing HSM *# CHANGING OF 30 MM DIA PIPE IN MILL PIT Isolating , disconnect ,connect Laminar hydraulic /grease hose of dia 30x4.5 mm of finishing HSM *# CHANGING OF 36 MM DIA PIPE IN MILL PIT Isolating , disconnect ,connect Laminar hydraulic /grease hose of dia 36x5mm of finishing HSM *# CHANGING OF 25- 36 MM DIA PIPE IN MILL P Isolating , disconnect ,connect & changing of hydraulic pipe dia from 36x5 to 25 x 3 mm of finishing & coiler HSM *# CHANGING OF 27-30 MM DIA PIPE IN MILL PI Isolating , disconnect ,connect & changing of hydraulic pipe dia from 27 x 4 to 30 x 4 mm of finishing & coiler HSM *# CHANGING OF 30-38 MM DIA PIPE IN COILER Changing of leaking pilot line of entry chute pipe etc of size 30-38 mmMS/SS argon arc weling changing of leaking pilot line of entry chute pipe etc of size 30-38 mmMS/SS arc welding of coiler HSM *# CHANGING OF 20 MM DIA PIPE IN COILER PIT Changing of damage/MS hyd/grease pipe of Size 20 X3 mm coiler pit HSM *# CHANGING OF 10 MM DIA PIPE IN COILER PIT Changing of damage/MS hyd/grease pipe of Size 10 x 1.5 mm coiler pit HSM *# CHANGING OF 8 M HP HOSE OF POWER TRACK To change coil car , power track hose assly. Each set consist of 8 mtlong hoses of coiler HSM *# REPLACEMENT OF FEEDER/PIPE/HOSE IN FIN To replace pipe feeders and fiting in entry / exit guides (F6-F12) laying out new pipe lines 30 x 4 to 20x3 mm complete with fiting of finishing HSM *# CHKG&FILG N2 ACCUMULATOR,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/N2 accumulator checking & filling with N2 bottle. *# MANNUAL GREASING OF BB CPLG,HSM *# TIGHTEN OF PUMP BASE BOLT,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Tightening of pump base bolts, pipe flangebolts, clamps & base bolts of valve stands. *# TIGHTEN OH PIPE BOLT/MAINT OF HSM EQPT Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Tighteningof over headpipe clamps mounted bolt in mill stand (Platform to be made to approach) *# TIGHTEN OF PIPE SUPPORTS,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Tightening of pipe supports at various places & rectification of broken supports (size 25-80mm) *# TIGHTEN HYD PIPELINE FLANGE,HSM Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Tightening of high Pr.hyd. Pipe line flanges, replace O ring and bolts as per requirement. *# CLNG OF OIL TANK/MAINT OF HSM EQPT, Maintenance of Servo, Aux, QWRC hydraulic system and grease system of finishing of HSM/Oil tank cleaning including disposal of oil cleaning normalisation *# REPAIR OF CLAMP IN MILL PIT & STAND To install new clamps and to weld broken pipe clamps (25-80mm) of finishing & coiler HSM *# C/T OF HYD PIPE LINES OF F/M TIGHTENING OF PIPE CLAMPS HYD PIPE FLANGE UNIONS & PIPE JOINTS OF MILL STAND AS WELL AS FIXING OF NEW CLAMPS AS REQD AT SITE *# RECTIFY HYD LEAKAGE TOP & BOTTOM P/R RECTIFICATION OF HYD OIL LEAKAGE BY CHANGING SEALS, PACKING, UNIONS & WELDING OF JOINTS - TOP & BOTTOM PINCH ROLL *# RECTIFY OF BREAST ROLL DEFECTS RECTIFICATION OF HYD OIL LEAKAGE BY CHANGING SEALS, PACKING, UNIONS & WELDING OF JOINTS - BREAST ROLL *# ENABLING JOB COIL CAR FOR WHEEL & CYL. RECTIFICATION OF HYD OIL LEAKAGE BY CHANGING SEALS, PACKING, UNIONS & WELDING OF JOINTS - COIL CAR REMOVAL & INSTALLATION FOR WHEEL & CYL. *# ENABLING JOB OF TILTER ASSLY. DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - TILTER ASSLY. *# ENABLING JOB OF HOLDING ARM CYL. DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - HOLDING ARM CYL. *# ENABLING JOB OF HYD MOTOR DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - HYD MOTOR *# ENABLING JOB OF ENTRY CHUTE CYL. DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - ENTRY CHUTE CYL. *# ENABLING JOB OF COIL CAR POWER TRACK DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - COIL CAR POWER TRACK *# ENABLING JOB OF STRIP SWITCH DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - STRIP SWITCH *# ENABLING JOB OF SIDE GUIDE DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - SIDE GUIDE *# ENABLING JOB OF TOP PINCH ROLL DISCONNECTION & CONNECTION OF HYD CYL TESTING / NORMALISATION - BOTTOM PINCH ROLL *# ENABLING JOB OF WRAPPER ROLL CHANGE DISCONNECTION OF HYD & GREASE LINE CONNECTION TESTING & NORMALISATION - WRAPPER ROLL CHANGE *# ENABLING JOB OF MANDREL CHANGE DISCONNECTION OF HYD & GREASE LINE CONNECTION TESTING & NORMALISATION - MANDREL CHANGE *# REV OF MANDREL HYD & GREASE ELEMENT MANDREL-Dismanting of all hyd pipe& greaselines mandrel removel ofall bend pipe,feeder & hoses testing all element removed & reparie installation of hoses layout of & fedeers preftting grease lines &check all points finaly connect all grease & hyd lines testing & normalisation . *# BLANK & CHANGE POWER TRACK S PIPE & HOSE "POWER TRACK-blanking leakage line dismantling all s hoses & pipes of hyd & grease testing & replacement prefiting grease hose assly erection , testing & commissioning. *# REM & FIX OF GUIDE GREASE PIPE & FEEDER GUIDE-Removal of all pipelines , hoses feedres checking grease after removing them installation of feeders layout of grease pipelines hoses & connect blocks remove pipe & grease feed.Check all point for proper grease assly again assemblefixing on guides providing supports testing & normalization. *# FAB & FIX OF COILER LUB & HYD PIPE *# RECT OF OIL LEAK FROM SEAL & JOINT "Rectfication of hyd oil leakage by chanching seals , packings unions & welding of joints *# REPLACEMENT OF HP HOSE & FITTING Replacement of high pressure hoses & power track hoses . *# REPLACEMENT OF FILTER ELEMENT replacement filter element assly to redone normalizing (90 sets of filters to be changed) *# SYSTEM ISOLATION BY VALVE & BLANK Isolating system ofclosing valve & providing blanks *# OPEN DRAIN VALVE & TRANSFER OIL To open valves & transfer 400 ltrs of oil intro drums buckets for re use *# TIGHTEN PINION STAND NIPPLE,HSM Maintenance of oil lubrication system of OC No: 1, 2, & 3 including Fce, R/G, F/G and also tightening of nipple, union, indicator of M/red.P/std, S/D reducers (R-1 to F-12) of HSM./Tightening of pinion stand nipple of R/G & Finishing stand *# TIGHT OFVALVE STAND BASE BOLT& CLAMP Tighting of base bolt of valve stands & clamping of pipe wherever required *# TIGHTENING OF SERVO BOX & MANIFOLD Tighting of servo box bolts power track hose union pipes |
|