Product Detail :
|
(I) Through Ballast Renewal for 4.00 KM from KM along with deep screening/raising
of ballast cushion to 35 CM from KM 452.00-456.00 S/L under ADEN/BNDM (II)
Bondamunda-Barsuan-TBR-44.305 TKM at Km 408.432-452.00= 43.568 KM and
Km 0.000-0.737= 0.737 KM, Total = 44.305 KM under the jurisdiction of
ADEN/BNDM (III) TFR 21.638 KM between DMF-BUF, DMF-Link C under
SSE/P.WAY/DMF (IV) TFR Between DMF-BUF & DMF-Link C under SSE/P.WAY/DMF
Unit for 27.612 KM in between DMF-CPE Up Line 413.607-435.000KM = 21.393KM
and SJ-BUF UP Line 445.781-452.00 KM (V) Labour Cost for Addition of track circuit
in Tupadih station. (77 Nos. Glued joint) in Bondamunda- Kiriburu Section in
Chakradharpur Division of South Eastern Railway
|
| Tender Detail : |
(I) Through Ballast Renewal for 4.00 KM from KM along with deep screening/raising
of ballast cushion to 35 CM from KM 452.00-456.00 S/L under ADEN/BNDM (II)
Bondamunda-Barsuan-TBR-44.305 TKM at Km 408.432-452.00= 43.568 KM and
Km: 0.000-0.737= 0.737 KM, Total = 44.305 KM under the jurisdiction of
ADEN/BNDM (III) TFR 21.638 KM between DMF-BUF, DMF-Link C under
SSE/P.WAY/DMF (IV) TFR Between DMF-BUF & DMF-Link C under SSE/P.WAY/DMF
Unit for 27.612 KM in between DMF-CPE Up Line 413.607-435.000KM = 21.393KM
and SJ-BUF UP Line 445.781-452.00 KM (V) Labour Cost for Addition of track circuit
in Tupadih station. (77 Nos. Glued joint) in Bondamunda- Kiriburu Section in
Chakradharpur Division of South Eastern Railway |