Product Detail :
|
Sale of property by liquidator, asset, all assets of the under construction thermal power plant (2 x 600 mw), includin movable and immovable assets located at tori, entire plant and machinery and other movable assets of the under construction thermal power plant (2 x 600 mw) located, upto 5000 mt of fabricated steel structure of an under construction thermal power plant (2 x 600 mw).
|