Product Detail :
|
Mechanised excavation, loading, transportation of 10, 00, 000 Te ROM from OT hill area to 2nd level stock pile at an average lead distance of 2.5 km after weighment at 60 Te pitless weighbridge (to be installed, operated and maintained by contractor) and includes water sprinkling, maintenance and leveling of ROM at stock pile at Gua Ore Mines, BSL, SAIL
|